Medical Office Fit-Out and Leasehold Improvements for Clinics

Short answer
A medical office fit-out turns a leased unit into a working clinic: walls, rooms, plumbing to sinks, heating and cooling, electrical and data, millwork, finishes and accessibility features. Most of that work counts as leasehold improvements, and the lease decides who builds and pays for which part, so the unit and the lease terms should be checked before you sign.
Most clinics in Toronto and the GTA open in leased space. The landlord hands over a unit in some agreed condition, and the tenant builds the clinic inside it. That process, the medical office fit-out, is where a clinic’s layout, building systems and finishes come together, and where many of the costs and decisions sit.
This guide explains leasehold improvements for clinic tenants from the construction side: what they are, how landlord and tenant work is usually divided, what to check before signing, and what happens at the end of the lease. Lease terms, allowances and tax treatment are for your lawyer and accountant.
What a Medical Office Fit-Out Includes
A typical clinic fit-out includes demolition of old partitions, new walls for exam rooms, consult rooms and support spaces, plumbing for exam room sinks and washrooms, changes to ductwork and controls, new lighting, power and data, millwork for reception and exam rooms, flooring, ceilings, doors and finishes.
Odima reviews services, staffing, equipment, room needs and the unit before construction decisions are made. Our medical clinic construction work and our leasehold improvement services both start with that review.
What Counts as Leasehold Improvements
Leasehold improvements are changes a tenant or landlord makes to a leased space so it suits the tenant’s use. They are built into the unit and usually stay with the building, unlike furniture and movable equipment, which the tenant takes when it leaves. Exactly how a given item is treated for tax and accounting is a question for your accountant.
Examples in a medical office include:
- Partition walls, doors and frames for exam rooms, consult rooms and offices.
- Plumbing for exam room sinks, a clean utility room, staff kitchens and washrooms.
- Ductwork, diffusers, controls and added cooling for rooms or equipment.
- Electrical panels, circuits, outlets, lighting and data cabling.
- Built-in reception desks, exam room cabinets and storage millwork.
- Flooring, ceilings, wall finishes and sound insulation.
- Accessible counters, washrooms and door hardware.
Landlord Work, Tenant Work and Base Building Conditions
Base Building
The base building is what the landlord provides and maintains: the structure, roof, main building systems, shared corridors, elevators and the building’s own washrooms. The lease or its schedules usually describe the condition the unit is in at handover, such as an empty shell, a unit with existing finishes, or a space the landlord has improved to a set standard.
Landlord Work and Tenant Work
Leases often include a schedule that splits the work. Landlord work might cover bringing services to the unit, a demising wall, a code-compliant washroom or an upgraded electrical service. Tenant work covers the clinic itself. The split varies from lease to lease, so read the schedule against your drawings to see which items are missing. Odima’s proposals list inclusions, exclusions, assumptions and allowances, and set out what stays with the owner, the landlord, the consultants and the equipment suppliers, which helps keep that split clear on site.
What to Check Before You Sign the Lease
Visit the unit with your contractor or designer before signing. Look at:
- Plumbing: drain and water line locations, and whether sinks in exam rooms can reach them without trenching the slab.
- Heating, ventilation and air conditioning: the age and capacity of the units serving the space, and whether rooms can be zoned.
- Electrical capacity: the size of the panel and service, and room for added circuits for equipment.
- Washrooms: whether there are washrooms in the unit or only in the corridor, and whether they are barrier-free.
- Accessibility: the entrance, the route from parking or transit, and door widths.
- Elevator: for units above grade, its size and whether it suits patients with mobility aids.
- Building rules: work hours, noise limits, freight access and approved contractor requirements.

Tenant Improvement Allowance and Other Lease Points
A tenant improvement allowance is an amount a landlord agrees to contribute toward the tenant’s improvements, often tied to conditions such as completed work, invoices or lien releases. Whether an allowance is offered, how much, and how it is paid are lease negotiation points; your lawyer reviews them and your accountant advises on how they are treated.
From the construction side, an accurate scope priced from your drawings helps you understand what an allowance would and would not cover. Other lease points that affect construction include rent-free periods for the build, the landlord’s approval timelines, who pays for base building upgrades, and the restoration clause.
Landlord Approvals and Building Rules
Most landlords require drawings for review before tenant work starts, and some require their own engineers to review mechanical, electrical or structural changes. Building rules may limit noisy work to certain hours, require protection of shared corridors and elevators, set insurance requirements for contractors, and control how shutdowns of shared systems are scheduled.
Permits for a Clinic Fit-Out in Toronto
In Toronto, a building permit is required for structural or material alterations, including “adding or removing walls (i.e., changing room sizes and/or uses)”, and for a change of use even when no construction is proposed. Installing cabinetry and millwork alone does not need a permit. The Ontario Building Code names medical offices among its Group D examples.
Toronto’s Express Building Permits stream covers interior alterations to Group D and E occupancies up to 600 square metres with no change in use, no change in patron area and no active building permit for the shell. For qualifying applications, an Examiner will review the application within 3 days.
Accessibility rules apply as well. The Building Code’s Section 3.8 governs barrier-free design of the building, and O. Reg. 191/11 covers newly constructed service counters and new or redeveloped waiting areas, with at a minimum one service counter that accommodates a mobility aid for each type of service provided.
Restoration at Lease End
Many leases include a restoration clause that may require the tenant to remove some or all improvements at the end of the term and return the unit to a set condition. For a clinic, that can mean removing sinks and capping plumbing, taking out partitions, or removing specialized equipment supports. What the clause requires, and whether it can be negotiated, is for your lawyer.
Coordinating the Fit-Out
A fit-out involves the landlord, the designer, engineers, trades, equipment suppliers and the clinic team. Odima coordinates trades, building systems and owner-supplied equipment interfaces, and reports progress, decisions needed and approved changes. If you already operate in the space, see our guide to medical office renovation in Toronto. If you are opening for the first time, our checklist for opening a medical clinic in Ontario covers the full path.
Learn more about our medical and healthcare construction work, see how we handle tenant improvements for commercial units and clinic build-outs across the GTA, or contact our team with your lease plan.
Frequently Asked Questions
What are leasehold improvements?
Leasehold improvements are changes made to a leased space so it suits the tenant’s use, such as new walls, plumbing, ductwork, electrical work, built-in millwork, flooring and finishes. They are built into the unit and usually stay with the building, unlike furniture and movable equipment. The lease sets out who builds and pays for them.
What qualifies as a leasehold improvement?
In construction terms, work that is fixed into the leased unit to adapt it for the tenant, such as partitions, doors, plumbing, ductwork, electrical circuits, lighting, built-in cabinets, ceilings and flooring. Movable furniture and equipment are generally separate. How a specific item is classified for tax or accounting purposes is a question for your accountant.
What are some examples of leasehold improvements in a medical office?
Exam and consult room walls and doors, exam room sinks and plumbing, clean and soiled utility rooms, added cooling and zoning, electrical circuits for equipment, data cabling, built-in reception desks and exam room cabinets, sound insulation, accessible washrooms and counters, and flooring and finishes suited to frequent cleaning.
Who typically pays for leasehold improvements?
Who pays for leasehold improvements is set by the lease, including any landlord work schedule and tenant improvement allowance, so have your lawyer review those terms before you sign. From the construction side, a scope priced from your drawings shows which items fall to each party.
What is a tenant improvement allowance?
A tenant improvement allowance is an amount a landlord agrees to contribute toward a tenant’s improvements to the leased space, usually paid under conditions written into the lease. Whether one is offered and how it works are lease negotiation points for your lawyer, and your accountant can advise on how it is treated.
Do I need a building permit for a clinic fit-out in Toronto?
Usually, if the fit-out adds or removes walls or changes the use of the unit. Toronto requires a permit for structural or material alterations and for a change of use even without construction, while cabinetry and millwork alone do not need one. Qualifying Group D interior alterations up to 600 square metres with no change of use can apply through Express Building Permits.
What happens to leasehold improvements at the end of a lease?
That depends on the lease. Many include a restoration clause that may require the tenant to remove some or all improvements and return the unit to a set condition, while others let improvements stay. Your lawyer can explain what your clause requires, and knowing it before design helps you plan the work.
Plan Your Medical Office Fit-Out With Odima
Send us your floor plan, equipment list, lease schedule and target dates, and we will review the unit and the scope with you. Odima is a general contractor serving Toronto and the GTA.
Planning a Clinic Build-Out?
Odima Construction builds and renovates medical, dental, physiotherapy, and rehab clinics across Toronto and the GTA. Send us your floor plan and target dates, and we will arrange a time to meet.